Whole homes
Full guts, additions, carport and garage conversions, flooring, roofing and trim. Phased so you can live through it and see what is happening at every stage.
Yellow Rose Construction renovates whole homes in San Angelo and across the Concho Valley — full interior guts, additions, carport and garage conversions, flooring, roofing and finish carpentry. Whole-home work is phased and scheduled in writing before demo begins.
The difference
Any crew can swing a hammer. The job that goes wrong is the one where the electrical is not ready when the drywall arrives. Whole-home work succeeds or fails on the order of operations.
On a full renovation, seven trades touch the same wall in a specific order. If the sequence is wrong, somebody re-opens finished work, and you pay for it twice — once in money and once in weeks.
We phase the job, put the phases in writing, and photograph each one as it closes. That is how a 1,800 square foot project stays a project instead of becoming an ongoing situation.
Real jobs
Whole-home work rarely starts with a design. It starts with a house that has an issue. These are the ones we can talk about in detail.
The job was a full home renovation that grew a wing. The carport was converted into two bedrooms, a full bathroom, and a new kitchen and dining area — which meant new framing, new mechanicals and a new roofline tying into the original house.
A large addition finished to read as original house rather than add-on: matching trim, consistent floor transitions, and the detail work at the seams that gives it away when it is done badly.
A simple room remodel where the customer needed more usable space. What was a back room became a proper master bedroom, with the enclosure, insulation and finish work that makes it a room instead of a converted porch.
How we phase it
Structure first, systems second, surfaces last. Every phase closes before the next one opens, so nothing finished gets reopened.
What we ask of you: one decision-maker, decisions made before the phase that needs them, and access to the house on scheduled days. That is the whole list.
Framing, additions, roof tie-ins, window and door openings. The house has to be dry and square before anything else matters.
Electrical, plumbing and HVAC inside the walls, inspected and photographed before insulation and drywall close it up.
Insulation, drywall, texture, paint, flooring. This is the phase that looks like progress and hides everything before it.
Cabinets, counters, fixtures, trim, doors, hardware, punch list. The last ten percent that takes the longest.
Renovation questions
Sometimes, and it depends on the scope. A phased renovation can keep a kitchen or a bathroom usable while other areas are worked. A full gut usually means moving out for part of it. We will tell you which one you are looking at during the walkthrough, not halfway through demo.
Yes — we converted a Paint Rock carport into two bedrooms, a full bath, and a kitchen and dining area. It involves framing, insulation, mechanicals, a floor system that can carry living loads, and a roofline that ties into the existing house properly.
Structural, electrical and plumbing work in San Angelo and Tom Green County can require permits depending on scope. We will tell you what your job needs during the estimate so it is in the budget and the timeline instead of appearing later.
On an older home, expect it. We stop, photograph it, price it separately and get your decision before proceeding. You will never get a surprise line item at the end for something we found in week two.
Yes. Additions are a large share of our whole-home work, including a 1,800 square foot living-space addition in Dove Creek. Additions require foundation, framing, roof tie-in and mechanical work — and a schedule that accounts for weather.
Free estimate within 50 miles of San Angelo. We will tell you what the house needs before we talk about what it could be.