Kitchens
Cabinets, counters, plumbing, lighting and the framing repair that was hiding behind the old backsplash. Free estimate, honest scope, rough-in photos as we go.
Yellow Rose Construction remodels kitchens in San Angelo and across the Concho Valley — cabinets, butcher block and stone countertops, sinks, stoves, backsplash, lighting and flooring. Estimates are free within 50 miles, and we open the walls before we price the job.
Scope
A kitchen is the most disruptive room in the house to remodel, because everything in it is connected. Move the sink and you move the plumbing. Move the stove and you move the gas and the vent.
A real job
The homeowner wanted a new sink, a new stove and a backsplash that stayed on the wall. What the demo revealed was a room built out of true by roughly an inch for every twelve — with walls that were not plumb and tile that had already begun letting go.
We squared it, corrected what the framing would allow, then finished the sink and stove installation and repaired the metal roof. The job took longer than the first quote would have. It also still looks right.
These things did not come as a total surprise, as there is always unforeseen problems that arise in a project of this sort. But no problem getting everything the customer needed done — from new sink and stove installation to metal roof repair. The whole project, even with setbacks, turned out great.
Before you compare bids
Two quotes for the "same" kitchen can differ by thousands and both be honest. These are the three variables that explain almost all of the gap.
Old plumbing, undersized wiring, water damage, out-of-square framing. A bid that assumes none of it exists is cheaper because it is guessing.
A cosmetic refresh keeps the layout. Moving the sink, range or island means plumbing, gas, venting and electrical — and that is where budgets go.
Stock cabinets and laminate are not the same purchase as custom cabinetry and stone. Neither is wrong. The quote should say which one you are getting.
The sequence
You will know what is happening in your kitchen before it happens. Here is the order, and where the disruption lands.
Start with a walkthroughFree, in person. We look at what is behind the cabinets where possible, and talk about layout before finishes.
Cabinets, counters, sink, tile and lighting get chosen before demo, not during it. Lead times decide the schedule.
The messy part. This is where we photograph the framing, plumbing and electrical before anything covers it.
Cabinets, template, counters, backsplash, fixtures, paint, punch list — and the photos of what is behind it all.
Kitchen questions
It depends on three things: what is behind the wall, how far the plumbing and electrical move, and the finish level. A cosmetic refresh and a full gut with a relocated island are not the same job at any price. That is why we look before we quote, and why the estimate separates the work you want from the repair the house needs.
Usually yes, with a temporary setup. We sequence demo, rough-in and finish so the longest disruption is as short as possible, and we tell you which days the water or power will be off.
Talk to us about it first. Owner-supplied cabinets can work, but the warranty split gets complicated and lead times still control the schedule. We will tell you honestly whether it saves you anything.
Yes — that is most of the work on older San Angelo homes. Water damage, out-of-square framing and undersized wiring get priced as a separate line so you can see exactly what the house needed versus what the design wanted.
The build itself is usually measured in weeks, but cabinet and counter lead times often set the calendar. You get a schedule before demo starts, and a call if anything moves it.
Free walkthrough within 50 miles of San Angelo. Bring your Pinterest board and your budget — we will tell you what fits.