Twelve answers, no sales script

The questions homeowners actually ask.

Cost, timeline, permits, mess, surprises behind the wall. These are the twelve questions that come up on almost every walkthrough — answered the way we answer them at the kitchen table.

Most remodeling questions come down to three things: what it costs, how long it takes, and what happens when the wall opens and something is wrong. The answers below are the short version. The written estimate is the long version, and it is free within 50 miles of San Angelo.

Cost and payment.

The number is the number. These four questions decide whether a quote is comparable to the other two you are holding.

How much does a kitchen or bathroom remodel cost in San Angelo?

It depends on the room's size, the condition behind the walls, and the finish level — which is why we do not quote a real number over the phone.

A cosmetic bathroom and a full gut with a new shower, subfloor and layout are different projects with different labour. The same is true of a kitchen: cabinet refacing is not the same job as moving plumbing and electrical.

We price from a walkthrough, write the scope line by line, and name the exclusions. Where we publish a fixed price — fencing at $67 per linear foot, for example — it is because the variables are limited enough to stand behind it.

Is the estimate really free?

Yes, within 50 miles of San Angelo. There is no charge for the drive, the measurement or the written scope.

We only ask for money when you accept the contract and put down the deposit that reserves your start date and materials.

If your project is outside the radius, we will tell you before booking the drive rather than invoice you for travel afterward.

Do you require a deposit?

Yes. A deposit reserves the schedule and orders materials; the amount and the milestone schedule are written into the contract.

Progress payments are tied to completed stages, not to calendar dates. The final payment comes after the punch walk, when you have had a chance to use the room and list what is wrong.

Be cautious with any contractor who wants most of the money before the work starts. That is not a deposit, it is a loan.

Do you offer financing?

Yes — through First Financial Bank, subject to the lender's credit approval and terms. There is also 10% off the labour portion for teachers, first responders, military and veterans.

The estimate comes first and does not require a credit check. If you decide to finance, we provide the project documents the lender needs and you deal with the bank directly.

See the financing page for the three payment routes and the disclosure in plain English.

Time and living through it.

A remodel is a construction site inside your home. The schedule and the dust control are part of the product.

How long will my project take?

Most bathrooms run two to four weeks on site, kitchens four to eight, and whole-home renovations three to six months. Your written schedule is the only one that counts.

Those ranges assume materials arrive on time and nothing unexpected is behind the wall. Cabinet and counter lead times are usually the long pole in a kitchen, not labour.

We give you a start date and a sequence before demo begins, and we tell you when a delay is ours versus a supplier's. Silence is the thing that makes a schedule feel longer than it is.

Can I live in the house during the remodel?

Usually yes for a kitchen or one bathroom, if you can set up a temporary kitchen and accept a few weeks of dust. A whole-home renovation is a different conversation.

We seal doorways with plastic, protect floors, sweep daily and haul debris rather than stacking it in the yard. If the water has to be off, we tell you the night before, not at 8am.

For a full-house job, phasing the work — or moving out for the demolition weeks — is often cheaper than living in a construction site for months.

How disruptive is the demolition?

Two or three loud, dusty days per room, then the job gets quieter. Demo is the worst of it.

We remove debris as we go instead of storing it in the driveway, and we keep a clear path to the bathroom and the kitchen for as long as possible.

If you have pets or small children, plan to be out for the demo days. That single decision makes the rest of the project much easier.

Scope, trades and surprises.

This is where cheap bids separate from real ones. Ask any contractor these five questions before you sign.

Do you pull permits?

Yes, when the work requires one. Permits and inspections are part of the scope, not an extra you discover later.

Structural changes, additions, electrical and plumbing work usually need a permit in San Angelo and the surrounding jurisdictions. We handle the application and meet the inspector on site.

If a bid is dramatically lower than the others, check whether permits are in it. Unpermitted work becomes your problem when you sell.

Do you use subcontractors?

Licensed electrical and plumbing trades, yes — the same local people we have used for years. Framing, drywall, tile, trim and finish work are our own crew.

Ask who will physically be in your house and who supervises them. On our jobs, Dillon or Bob is on site, and the number on this website reaches Dillon.

We do not hand the whole job to a broker who then finds the cheapest crew. That model is why "the contractor disappeared" is a common story.

What happens if you find mold, rot or out-of-square framing?

We stop, photograph it, price it separately, and wait for your decision before covering it back up.

On older San Angelo homes this happens often. The Mertzon kitchen was out of square by an inch every twelve inches, with walls out of plumb — which is why some backsplash tile came off during demo.

You get three options: fix it now, phase it, or leave it with the consequence explained. What you do not get is a surprise line item at the end of the job.

Can I change my mind once the work starts?

Yes, within reason. Changes get priced and approved in writing before they are built, so the budget stays honest.

Moving a wall after drywall is expensive. Choosing a different tile before the order is placed is nearly free. The earlier you raise it, the cheaper it is — that is true on every job.

We will also tell you when a change is not worth the money, even if it means less work for us.

Do you handle insurance claims?

Yes — fire, water, mold and storm damage. We document the damage, photograph the rough-in, and build to the scope the adjuster approves.

Insurance work moves at the insurer's pace, not ours. We can tell you what the settlement is likely to miss — matching flooring, code upgrades, the subfloor under the visible damage — before you accept it.

See the insurance restoration page for the step-by-step process.

Local, insured and reachable.

The unglamorous questions that decide who you let into your house.

What areas do you serve?

San Angelo and roughly 50 miles around it — Mertzon, Paint Rock, Christoval, Dove Creek, Lake Ivie, Llano and the surrounding Concho Valley counties.

Free estimates inside that radius. Larger projects further out are considered case by case, and we will tell you honestly whether the travel makes the job sensible.

The service area page lists the towns and the kind of work we have done in each.

Are you licensed and insured?

We carry general liability insurance and provide the certificate with the estimate. Electrical and plumbing are performed by licensed trades, and permitted work is inspected.

Texas does not license general contractors statewide the way some states do, so "licensed and insured" can mean very little on a contractor's website. Ask for the insurance certificate and the name of the licensed trades they use.

Any contractor who gets defensive about that request is answering the question for you.

Still deciding

One question beats all twelve.

Ask every contractor you are considering for a photo of the rough-in stage from a job they finished this year. The ones who can produce one are in a different category from the ones who cannot.

Ask us the thirteenth question.

Free walkthrough within 50 miles of San Angelo. Bring the question you think will annoy us — it is usually the useful one.